What we do

Scopes we
self-perform

Reinforcing steel is all we do. That means our foremen read the drawings, our crews know the bar list before they get on site, and nobody is learning your job on your schedule. See these scopes on real jobs in the portfolio, or send drawings for a number.

01 — Core scope

Rebar Installation

Placing and tying reinforcing steel to print — footings, grade beams, slabs on grade, walls, columns, pier caps and mat foundations.

  • Placed to drawingBar size, spacing, laps and cover set from the structural drawings and the bar list — not from memory.
  • Supported properlyChairs, bolsters and slab bolsters sized so the mat holds its elevation under boots and buggies.
  • Tied to holdIntersections tied at the frequency the spec calls for, so nothing walks during the pour.
  • Ready for inspectionWe walk it with the inspector and fix what's called before the truck shows up.
Large-format slab-on-grade mat set within edge forms at Bunker, Blythewood SC
Bunker, Blythewood SC — large-format slab-on-grade mat set within edge forms.
Deep strip footing cage along the building perimeter with dowels set at Bunker, Blythewood SC
Bunker, Blythewood SC — deep strip footing cage along the perimeter, dowels set.

02 — Core scope

Tie-In

Joining new steel to what's already in the ground. Dowels, laps, splices and cold joints — the connections that decide whether two pours behave like one structure.

  • Lap lengths heldWe hold the lap schedule. Short laps are the cheapest problem to cause and the most expensive to fix.
  • Dowel layoutDowels set to template and secured so they're still where the print put them when the forms come off.
  • Existing conditionsField-verified before we start. If what's in the ground doesn't match the drawing, you hear it from us that day.
  • Clean jointsSteel kept clear of the joint line so the next pour bonds the way the engineer drew it.

03 — Core scope

Tilt-Up

Panel reinforcing on the casting slab, built to the erection drawings and ready for the crane on the day the schedule says.

  • Panel mats & trimField mat, trim bar around openings, and corner reinforcement placed per the panel drawings.
  • Lift & brace insertsInserts set to the engineered layout and tied off so nothing shifts under the finishers.
  • Embeds & weld platesLocated, secured and checked against the panel elevation before the pour.
  • Crane-day readyPanels sequenced to match the erection order so the crane never waits on steel.
Long-format tilt-up panel slab tied and formed at Cash Corporate, Apex NC
Cash Corporate, Apex NC — long-format panel slab, tied and formed, ready for pour.
Slab-on-metal-deck reinforcement tied over structural steel framing at Scout, Blythewood SC
Scout, Blythewood SC — slab-on-metal-deck reinforcement over structural steel.

04 — Core scope

Elevated Decks

Top steel, bottom steel and everything between — on composite metal deck and formed slabs, worked safely at height.

  • Two-way matsBottom and top mats placed and supported so the top steel stays top steel after the pour crew walks it.
  • Column & shear zonesAdditional bars, studs and shear reinforcement at columns and drops, placed to the framing plan.
  • Tied off, all day100% tie-off at height. Leading edges flagged, holes covered, deck kept clear.
  • Pour-rate readyDeck loaded and staged so the mat gets tied ahead of the concrete, not behind it.

Also on the truck

Supporting scopes

Things that come up on ground-up jobs — and that we'd rather handle than watch hold up your pour.

05

Foundations & Cages

Continuous footings, mat foundations, pile caps and drilled pier cages — prebuilt on the deck or tied in the trench, whichever the site allows.

06

Manpower on Short Notice

Crews available to supplement your own when a pour date moves up or a job falls behind. They read prints and arrive with their own tools.

07

Unloading & Staging

Taking delivery, sorting by mark, and staging bar where the crew needs it so nothing gets double-handled across the site.

Scope it out

Tell us what you're building

We'll tell you straight whether we're the right crew for it.

Call Get an Estimate